Support IQC

A successful transition to incoming inspection software
Request an IQC demo

Build your IQC support offer according to your needs

When implementing incoming inspection software, support is crucial to ensure a successful transition. Appropriate support from qualified experts helps to guide teams in the use of a new tool, to optimize the configuration of incoming inspection software, and thus to minimize resistance to change. The aim is to ensure smooth adoption and rapid use of the tool.


Installation of our IQC (Incoming Quality Control) module requires a number of steps to optimize its use. Deliverables must be submitted to move from one stage to the next.

Here's how IQC can help you set up incoming inspection on your production site.

You can work independently or with our team of consultants.

Our offer

Basic

Autonomous deployment
  • Digital user guide
  • 1-day on-site diagnosis
  • Ellistat support
  • Data transfer from existing database (optional)

Standard

Supported deployment
  • Digital user guide
  • 1-day on-site diagnosis
  • Creation of standards (2 to 5 days on-site)
  • Ellistat support
  • Data transfer from existing database (optional)

Plug & Play

Customized support
  • Digital user guide
  • 1-day on-site diagnosis
  • Creation of standards (2 to 5 days on-site)
  • User training for incoming inspection (1 to 2 days)
  • Production support (1 day per month for 6 months)
  • Ellistat support
  • Data transfer from existing database (optional)

Our Methodology

Assessment
1 day on-site
Before implementing IQC (Incoming Quality Control) software, it is essential to understand the entire production process.
Objectives

Evaluate the feasibility of incoming inspection / inspection by sampling.

The diagnosis therefore makes it possible to:

  • define the project team
  • Create a realistic project schedule
  • prepare Ellistat installation and connection of measuring instruments
  • Prioritize steps and prepare the training plan
Deliverables
  • IQC project Gantt
  • Completed Project Charter
Creating standards
2 to 5 days on site
Software configuration and training of administrators in the use of Ellistat IQC
Objectives
  • Website creation
  • Creating inspection plans
  • Creating custom fields
  • Setting contexts and alerts
  • Measuring instrument connection
  • Determining part frequencies and quantities
  • Batch management with Ellistat IQC
  • Dashboard creation
Deliverables
  • IQC software parameterized
  • Range creation standard
  • Control standard
  • Connected measuring instruments
Data transfer
On request
Whatever the type of initial data, database, Excel files, etc., our teams will automate the transfer of data to Ellistat so that you can use the solution directly.
Objectives
  • Automated import of customer data into Ellistat
Deliverables
  • Ranges imported into Ellistat
Training
1 day on-site
Objectives
  • Know the basic statistics needed to understand sampling
  • ISO 2959 and ISO 3951 standards
  • Interpret an efficiency curve to assess sampling quality
  • Know all the control strategies - including the most modern ones
  • Implementing an optimal sampling control strategy
Deliverables
  • Trained, autonomous team
Putting in
production
1 day per month
for 6 months
Objectives
  • Adapting Ellistat's IQC module settings to the realities of the field
  • Technical questions & answers
  • Using capability indicators
  • Adapt sampling frequency and size
  • Set up field routines
Deliverables
  • Ellistat adopted by the whole team
Request a demo

Our Experts

Davy Pillet
Davy Pillet
CEO
Expert in statistics and industrial process optimization.
Abdelilah Khibi
Abdelilah Khibi
SPC/IQC Expert
Expert in applied statistics and industrial process optimization.
Ismail Taleb
Ismail Taleb
PhD Industrial Engineering
Expert in applied statistics and production management.
Machine tools machining a revolutionary part with automated process control

I would like to be contacted for IQC