Support IQC

A successful transition to incoming inspection software

Request a demo

Build your IQC support offer tailored to your needs

When implementing incoming inspection software, support is crucial to ensure a successful transition. Appropriate support from qualified experts helps to guide teams in the use of a new tool, optimize the configuration of incoming inspection software, and thus minimize resistance to change. The aim is to ensure smooth adoption and rapid use of the tool.

The installation of our IQC module (Incoming Quality Control) requires different stages to optimize its use. Deliverables must be presented in order to move from one stage to the next.

Here's how IQC can help you set up incoming inspection on your production site.

You can work independently or with our team of consultants.

Our Offer

  • Basic
    Autonomous deployment
    • Digital user guide
    • 1-day on-site diagnosis
    • Ellistat support
    • Data transfer from existing database (optional)
  • Standard
    Supported deployment
    • Digital user guide
    • 1-day on-site diagnosis
    • Standard creation (2-5 days on-site)
    • Ellistat support
    • Data transfer from existing database (optional)
  • Plug & Play
    Customized support
    • Digital user guide
    • 1-day on-site diagnosis
    • Standard creation (2-5 days on-site)
    • SPC user training (1-2 days)
    • Production support (1 day per month for 6 months)
    • Ellistat support
    • Data transfer from existing database (optional)

Our Methodology

Diagnosis
1 day on site

Before implementing IQC (Incoming Quality Control) software, it is essential to understand the entire production process. 

Objectives

Evaluate the feasibility of incoming inspection / inspection by sampling.

The diagnosis therefore makes it possible to:

  • define the project team
  • draw up a realistic project schedule
  • prepare Ellistat installation and connection of measuring instruments
  • prioritize steps and prepare the training plan
Deliverables
  • IQC project Gantt
  • Completed project charter
Creating standards
2 to 5 days on site
Objectives

Software configuration and training of administrators in the use of Ellistat IQC:

  • Website creation
  • Creating inspection plans
  • Creating custom fields
  • Setting contexts and alerts
  • Measuring instrument connection
  • Determination of part frequencies and quantities.
  • Batch management with Ellistat IQC.
  • Creating dashboards
  • ...
Deliverables
  • IQC software parameterized
  • Range creation standard
  • Control standard
  • Connected measuring instruments
Data transfer
on request

Whatever the type of initial data, database, Excel files, etc., our teams will automate the transfer of data to Ellisitat so that you can use the solution directly.

Objectives
  • Automate the import of customer data into Ellistat.
Deliverables
  • Ranges imported into Ellistat
Training
1 day
IQC Advanced
  • Know the basic statistics needed to understand sampling
  • ISO 2959 and ISO 3951 standards
  • Interpret an efficiency curve to assess sampling quality
  • Know all the control strategies - including the most modern ones
  • Implementing an optimal sampling control strategy
Production start-up
1 day per month for 6 months
Objectives
  • Adapting Ellistat's IQC module settings to the realities of the field.
  • Technical questions & answers
  • Use capability indicators.
  • Adapt sampling frequency and size.
  • Set up field routines
Deliverables
  • Ellistat adopted by the whole team

Our Methodology

1. Diagnosis
2. Creating standards
3. Data transfer
4. User training
5. Going into production
Diagnosis
1 day on site

Before implementing IQC (Incoming Quality Control) software, it is essential to understand the entire production process. 

Objectives

Evaluate the feasibility of incoming inspection / inspection by sampling.

The diagnosis therefore makes it possible to:

  • define the project team
  • draw up a realistic project schedule
  • prepare Ellistat installation and connection of measuring instruments
  • prioritize steps and prepare the training plan
Deliverables
  • IQC project Gantt
  • Completed project charter
Creating standards
2 to 5 days on site
Objectives

Software configuration and training of administrators in the use of Ellistat IQC:

  • Website creation
  • Creating inspection plans
  • Creating custom fields
  • Setting contexts and alerts
  • Measuring instrument connection
  • Determination of part frequencies and quantities.
  • Batch management with Ellistat IQC.
  • Creating dashboards
  • ...
Deliverables
  • IQC software parameterized
  • Range creation standard
  • Control standard
  • Connected measuring instruments
Data transfer
on request

Whatever the type of initial data, database, Excel files, etc., our teams will automate the transfer of data to Ellisitat so that you can use the solution directly.

Objectives
  • Automate the import of customer data into Ellistat.
Deliverables
  • Ranges imported into Ellistat
Training
1 day
IQC Advanced
  • Know the basic statistics needed to understand sampling
  • ISO 2959 and ISO 3951 standards
  • Interpret an efficiency curve to assess sampling quality
  • Know all the control strategies - including the most modern ones
  • Implementing an optimal sampling control strategy
Production start-up
1 day per month for 6 months
Objectives
  • Adapting Ellistat's IQC module settings to the realities of the field.
  • Technical questions & answers
  • Use capability indicators.
  • Adapt sampling frequency and size.
  • Set up field routines
Deliverables
  • Ellistat adopted by the whole team
Request a demo

Competitive Experts

I would like to be contacted IQC

I accept the terms and conditions and have read the privacy policy. I understand that my data will be processed in accordance with the General Data Protection Regulation (GDPR). *