Module Structure

Reading time

The Data Analysis sidebar reads as follows: two blocks, and this partition is the module's map.

Manage (where the data is stored):

EntranceRole
List of My ProjectsCreate, open, share, and delete projects.
Project SchedulesThe current project's data table: entry, import, export.

Analysis (what we do with the data):

EntranceWhat it coversDedicated Guide
Gage R&RValidation of Measurement EquipmentGage R&R
GraphicsRepresentations and Statistical EvidenceGraphics
Descriptive StatisticsDistributions, control charts, capabilitiesDescriptive Statistics
Inferential statisticsHypothesis Testing, Power, and Causal AnalysisInferential statistics
Multivariate StatisticsACP, ACM, FAMD, T², classificationMultivariate Statistics
Experimental DesignDevelopment of Test PlansExperimental Designs
Machine LearningPredictive Modeling and OptimizationMachine Learning
ReliabilityService life, accelerated testing, return trackingReliability

💡 The order of the two blocks is the order of operations: we prepare in Manage, we operate in Analysis. A typical session involves opening a project, checking the grid, and then switching between analysis menus without ever modifying the data.

⚠️ All analysis pages require a selected project. If no project is selected, they display a «Select a Project» dropdown menu in place of their content. This is not an error: the module needs to know which data to work with.