The Data Analysis sidebar reads as follows: two blocks, and this partition is the module's map.

Manage (where the data is stored):
| Entrance | Role |
| List of My Projects | Create, open, share, and delete projects. |
| Project Schedules | The current project's data table: entry, import, export. |
Analysis (what we do with the data):
| Entrance | What it covers |
| Gage R&R | Validation of Measurement Equipment: Accuracy, Repeatability and Reproducibility of Measurements and Attributes, Linearity |
| Graphics | Automatic Data-Driven Visualizations and Statistical Evidence |
| Descriptive Statistics | Continuous and discrete distribution laws, control charts, capabilities, Fourier series, ISO control plan, ISO prediction and dispersion intervals, calculation of control limits |
| Inferential statistics | Hypothesis Testing, Equivalence Testing, Power Analysis, Cause Analysis (BOB vs. WOW, Component Inversion, Hierarchical ANAVAR) |
| Multivariate Statistics | ACP, ACM, FAMD, T², classification, dendrogram |
| Experimental Design | Designing Experimental Designs: 2-level designs, multilevel designs, response surface designs, filling designs, Smart DOE, D-optimal designs |
| Machine Learning | Predictive modeling of quantitative and qualitative responses, Simultaneous optimization across multiple models, Bayesian optimization, Optimization of mixture designs |
| Tolerance | Tolerance determination using correlation, Monte Carlo simulation, or nested dimension chain analysis |
| Reliability | Design of reliability tests, stress-strain analysis, service life, accelerated testing, return tracking |
💡 The order of the two blocks is the order of operations: we prepare in Manage, we operate in Analysis. A typical session involves opening a project, checking the grid, and then switching between analysis menus without ever modifying the data.
⚠️ All analysis pages require a selected project. If no project is selected, they display a «Select a Project» dropdown menu in place of their content. This is not an error: the module needs to know which data to work with.
